Apartment renovations in Dubai
Apartments and penthouses renovated inside the rules of the building. Kitchens and bathrooms are usually the core, and the building’s approvals sit on the critical path.
What an apartment renovation covers
A finish renovation or a replan of an apartment or penthouse in a managed building: kitchens, bathrooms, floors, ceilings, lighting, joinery, and the services that serve them, carried out within the building’s no-objection certificate and its working rules.
What it is not A tower apartment is not a villa programme with the garden removed. The building owns the risers, the slab, the facade, and the hours. The plan is written inside those limits from the start.
Who this page is written for
Owners of apartments and penthouses in managed buildings across Dubai who want the renovation planned around the building’s rules rather than surprised by them.
For a villa or townhouse, see villa renovations. For an office or commercial unit in a tower, see commercial fit-out.
What an apartment programme can include
- Survey of services, risers, and what the building allows to move
- Building management NOC prepared and submitted
- Protection of lifts, lobbies, and corridors
- Kitchen replanned or renewed, with extraction resolved
- Bathrooms with waterproofing renewed and tested
- Floors, ceilings, and lighting
- Wardrobes and storage joinery built to the rooms
- Electrical renewal within the apartment’s supply
- Snagging and handover
Working inside a managed building
A managed building in Business Bay, Dubai Marina, Downtown, or a Palm residence has a management company with its own permit, working hours, and deposit. Wet works, drainage, and anything touching a riser or the slab usually need a no-objection certificate before a tool is lifted. Bridgemark prepares that submission as the first task, because nothing else can be programmed until it is granted.
Materials arrive by service lift on booked slots, with the lift, lobby, and corridor protected. Neighbours above and below are told what is happening and when. Drainage rarely moves without approval, so the plan is drawn around the existing stacks, and extraction for a kitchen that opens onto the living room is resolved with the building’s ducting rather than promised.
- NOC submitted before the programme is fixed
- Working hours and noisy-works windows set by the building
- Service lift bookings and floor protection in the programme
- Drainage stacks and risers treated as fixed unless approval says otherwise
The apartment sequence
-
Survey
Services, stacks, ceiling voids, and the building’s rules. What the household wants changed.
-
Scope
What moves, what stays, what the NOC will need to show. A figure follows.
-
Design and specification
Kitchen, bathrooms, joinery, and finishes drawn against the fixed services.
-
Approvals
Building management NOC and any authority submission the scope requires.
-
Execution
Protection, strip-out, services, waterproofing, finishes, and joinery inside the permitted hours.
-
Handover
Snagging closed, systems demonstrated, building deposit released.
Kitchens that open onto the living room
Bathrooms on a fixed stack
The building is the client too
A renovation in a tower is judged by the people who live beside it. Common areas are protected and cleaned daily, noisy work sits in the permitted windows, and the supervisor is the one point of contact for the building management. Deposits are returned when the building is satisfied, and the programme is written to make that ordinary.
Typical programme
Apartment programmes are typically shorter than villa programmes and are measured in weeks once the NOC is granted and stone and joinery are ordered. The NOC itself sits on the critical path and its timing belongs to the building. A date is written into the contract after the scope and the approval are known.
What decides the cost
Apartment budgets are driven by the wet rooms, the joinery, and the building.
- Size and number of rooms in scope
- Whether the kitchen or a bathroom is replanned or renewed in place
- Specification of stone, joinery, and sanitaryware
- Building working hours and lift access
- Ceiling voids and how far services can be re-routed
- NOC requirements and any authority submission
A figure is prepared after the survey. Book a Free Site Survey.
Pages that sit beside this one
Renovations
Whole-property renovations and fit-outs for villas, apartments, and selected commercial interiors, under one contract and one supervisor.
All of renovationsVilla renovations
Whole-house renovation of an existing villa, from structure and services to kitchens, bathrooms, stairs, and joinery.
Read about villa renovationsCommercial fit-out
Offices and selected commercial interiors, from shell or occupied, with partitions, ceilings, lighting, data, and joinery under one programme.
Read about commercial fit-outWhat owners ask before they start
Do I need permission from the building to renovate my apartment?
For wet works, drainage, and most work touching services, yes. Building management or the master developer issues a no-objection certificate, and larger changes may also need Dubai Municipality or the relevant authority. Bridgemark prepares the submission as the first task of the programme.
Can the kitchen be opened to the living room?
Often, if the extraction can be routed. We confirm the duct route with the building before the plan is fixed. Where the building will not allow it, we design a semi-open kitchen that does not depend on a duct it cannot have.
Can you move a bathroom?
Drainage in a tower is shared and rarely moves without approval. Most bathrooms are replanned around the existing stack. Where a move is possible, it is submitted and approved before it is drawn as final.
What about the neighbours?
Noisy works are kept inside the building’s windows, common areas are protected and cleaned daily, and the supervisor is the building’s single contact. The programme is written to keep the deposit returnable.
How long does an apartment renovation take?
Typically weeks rather than months once the NOC is granted and the long-lead items are ordered. The approval timing belongs to the building. The contract carries the date once both are known.